Mall of Montenegro's first phaze which is called "Green Bazaar" opened with a great ceremony.Green Bazaar is an important project which is aiming to improve lifestyle&conditions of Montenegrins.
April 28,2007 Mr. Murat Aksoy who has been working in Gintaş Construction and Gimat Logistic as Accountancy and Procurement chief for six
April 22,2007 Technical committee composed of Dean of the Montenegro/Podgorica University Faculty of Engineering, Mr. Duskov Lucic and other lecturers Radijove Mrdak,
April 13,2007 Our strategy development to enlarge our activity within whole of the Balkan region, subsidiary of GintaşALB company has been founded in Kosova which is going to be
April 18,2007 The contract including curtain wall works and environmental arrangement of the central building of BKT Bank
April 06,2007 Renovation work of Merinos Wedding Hall which is in the scope of Merinos Atatürk Cultural and Congress Center Project
March 24,2007 The mark and logo study of the shopping and trade center of the Green Bazaar Project,
February 27,2007 After completion of application project, site excavation of Opera House which is a part of Merinos Atatürk Cultural and Congress Center
February 16,2007 The Minister of Industry and Commerce, Mr. Ali Coşkun and his committee arrived
in Podgorica on 14th February and met with the Turkish ambassador to Serbia, Mr.
Hasan Servet Öktem.
February 10,2007 The Peshkopi Water Supply and Sewerage Project in Podgorica, Albania,
January 12,2007 Rough construction of one of the largest investment projects of Gintaş Group,
January 02,2007 Gintaş Group Management Board met with their employees in the central office to celebrate the new year.
December 12,2006 In the pearl of the Aegean Sea, Bodrum Gündoğan Bay, the conceptual projects of a Boutique Hotel and Residences have been completed by
November 15,2006 BURSU 10, WHICH HAS BEEN CONTINUING SINCE MAY 2004 AND INCLUDES SEWERAGE-RAIN WATER-DRINKING WATER NETWORK CONSTRUCTION, DOMESTIC SUBSCRIPTIONS TO SEWERAGE and
September 15,2006 Gintas ALB ; successfully finished the Fushe-Kruje Water Supply and Sewerage Project. This project was one of the important projects in Albania.
June 03,2006 Parliament of Republic of Montenegro announced the decision for the establishment of independent Republic of Montenegro. Witnessing this exciting historical event, we, as Gintas Group, are expressing our sincere wish that this decision to be for benefit and to bring happiness to Montenegro people.
May 31,2006 21 May referendum results for independency of Montenegro are officially broadcasted as positive with 55.5 % of votes saying “ DA”
May 22,2006 Gintasmont Investment, Construction & Trade d.o.o. is established in Podgorica / Montenegro.
May 14,2006 First Concrete Ceremony held for starting of Green Bazaar Shopping Center in Podgorica by honoring participation of President of Republic of Montenegro,
April 19,2006 Starting ceremony held for Ataturk Culture and Congress Centre in Bursa with honouring participation of Minister of Finance.
April 10,2006 Contract for Green Bazaar Shopping Centre Project is signed in Podgorica between GINTAS INC and Public Utility Services of Podgorica Municipality by honouring presence of Turkish Ambassador to Belgrade.
March 31,2006 Contract Draft for Green Bazaar Shopping Centre is discussed and accepted by Assembly of Podgorica Municipality.
March 23,2006 Contract negotiations for Green Bazaar Shopping Centre are completed successfully.
March 21,2006 Contract for "Construction and Furnishing of 5 New Btranches" is signed by GINTASALB with BKT, Banka Kombetare Tregtare in Tirana / Albania.
March 20,2006 Contract for "Construction of Ataturk Culture and Congress centre" is signed by GINTAS INC with Metropolitan Municipality of Bursa.
February 23,2006 Preliminary assignment letter for Gundogan/BODRUM hotel project is released by Ministry of Culture and Tourism.
February 22,2006 GINTAS INC participated the tender by Municipality of Bursa for ATATURK CULTURE AND CONGRESS CENTRE and presented the best offer.
February 16,2006 GINTAS INC received the certification for ISO 14001:2004 for Environmental Management Systems.
February 16,2006 GINTAS INC received the certification for OHSAS 18001:1999 for Occupational Health and Safety Management Systems.
February 03,2006 Final offer of GINTAS INC about Green Bazaar Shopping Center is accepted.
January 20,2006 GINTAS INC, on behalf of GINTAS GROUP, is invited for further procedures as the result of successful tender for assignment of land in Gundogan / BODRUM, by Ministry of Tourism and Culture.
January 09,2006 GINTAS INC has given the best offer Green Bazaar Shopping Centre Project, according to initial evaluations.