Borçelik RCM 3

Total Pouring Concrete: 5.519m3 Total Framework: 5589 m2 Total Reinforcement Steel: 608 ton Embedded Steel Construction Element: 89, 075 kg Anchor bolt montage into foundation concrete: 12,912.92 kg

Machine foundations of New Roll building which is located on the l of 1.225m2 total floor area below sea level has been constructed at 10 meter depth 10 step.
Approximately 13 ton anchor bolt, 89 ton various sizes embedded element 192 meter spiral anchor box have been installed. Construction period is 6 month since framework repetition step method of concrete placement.
PROJECT DETAILS
Project Name Borçelik RCM 3
Place Bursa / Turkey
Job Provider BORÇELİK AŞ
Contract Period 2007 / 2008


Spot Alt