Borçelik RCM 3
Total Pouring Concrete: 5.519m3
Total Framework: 5589 m2
Total Reinforcement Steel: 608 ton
Embedded Steel Construction Element: 89, 075 kg
Anchor bolt montage into foundation concrete: 12,912.92 kg
Machine foundations of New Roll building which is located on the l of 1.225m2 total floor area below sea level has been constructed at 10 meter depth 10 step.
Approximately 13 ton anchor bolt, 89 ton various sizes embedded element 192 meter spiral anchor box have been installed. Construction period is 6 month since framework repetition step method of concrete placement.