The Peshkopi Water Supply and Sewerage Project

Peshkopia is located in the north of Albania. Islamic Development Bank financed the Project which held between 2004-2006.Project includes all of the city infrastructure, drinking water, rain water sewage networks were covering construction.

Construction of deep ground wells – 3 item with a capacity of 20 - 35 l/s, h:44 m pump installation, construction of water reservoirs with a capacity of 200 m3 construction of two different water supply station including pump installations with a capacity of 70lt/sn h: 220 mt pumps, water transmission lines Ø 200 mm HDPE pipe ;1650mt, Ø 315 mm steel pipe 4800 mt, water supply network between Ø 75-355 mm diameters by HDPE pipe 7465 mt total length, construction of sewage network between Ø 200 – Ø 630 mm diameters 3750mt with HDPE pipe, construction of stormwater network between Ø 200 – Ø 1000 mm diameters 3703 mt length with HDPE concrete pipes

Ministry Of Territory Adjustment And Tourism Tirana/Albania
PROJECT DETAILS
Project Name
Contract Period Peshkopia / Albania
Job Provider Ministry Of Territory Adjustment And Tourism Tirana/Albania
Contract Period 2004 / 2006


Spot Alt
  • 01
  • 02
  • 03
  • 04
  • 05
17.08.2010
..

...
more »
09.06.2010
...

...
more »
29.03.2010
26.04.2010
Montenegro Water Supply Project Completed


more »
03.04.2010
Genel Bakış Gintaş Tarihçe