Montenegro Water Supply Project
Contract of the project which has been tendered by World Bank funds for the purpose of regional water supply system construction of the Montenegrin Coast has been implementing by Administration of Regionalni Vodovod Crnogorsko Primorje” was signed on the date of 24 March 2008.
Within the scope of this Contract, approximately 17km DN700mm diameter steel transmission lines shall be installed. Besides of the main pipeline construction works, montage of valves necessary fitting elements required civil other mechanical works for construction of auxiliary structures to be served valve, discharge room, etc. shall be performed.
Implementation of Lot 3 Contract which is very difficult project since the working obligation generally in the narrow streets under heavy traffic conditions additionally hard topographic conditions arising from highls characteristic of work site has been bringing off by the professional team of Gintaş It is planned to be completed operated in June, 2009.
1.1. Contract Details:
1.1.1. Contract Title: Montenegro Sustainable Tourism Development Project Contract No. MSTDP- CSB-003/3, Construction Of The Continental And Southern Branch Of The Regional Water Supply System For The Montenegrin Coast, Lot3 Southern Branch Section R. “Durmani” – B.C. “Café”
1.1.2. Employer: Public Enterprise For Water Supply, Waste Water Treatment And Drainage And Solid Waste Disposal “Regionalni Vodovod Crnogorsko Primorje”
1.1.3. Initial Contract Period: 24.03.2008